DevFeeFinder
TransportationSet by regional JPA fee

I-5 Subregional Corridor Mitigation Fee

Levied by City of West Sacramento — Engineering Division on new development in West Sacramento. Authorized under the Mitigation Fee Act - Gov. Code Sec. 66000 et seq., adopted by each member agency; the JPA itself under Gov. Code Sec. 6500 et seq. Collected at building permit.

What one house pays

$1,575

For a typical home: a 2,000 sq ft detached house on a 0.13 acre lot, on a new subdivision lot — this fee varies by house size, so see the full schedule below.

Share of West Sacramento's total
2%
Total one-time fees here
$86,648
Adjustment
Adjusts yearly · ENR construction cost index · July
what the document says

annual, ENR Construction Cost Index, by the ratio of the most recent July ENRCCI to the July 2015 ENRCCI (10037)

Next expected change
1 Jul 2027

The record

Why it exists

“These mitigation fees for impacts to the I-5 Subregional Corridor are supported by a study entitled Nexus Study for the I-5 Subregional Corridor Mitigation Program by DKS, dated January 2016.”

City of West Sacramento Engineering Division, "General Notes & Requirements / Permit Information / Fee Schedules", January 2021, effective January 1, 2021; FEE SCHEDULE E — "Traffic Impact Fees—I-5 Subregional Corridor Mitigation In Lieu Fee", page 18, first paragraph · source document ↗
Where it applies

“This is a voluntary fee program, payment of which would be considered mitigation towards traffic impacts on the I-5 subregional corridor in lieu of preparing a traffic model analysis of those impacts. This fee program applies to projects which: 1) Meet or exceed the defined threshold of significance of 100 peak period automobile trips per day; and 2) Are not exempt from mitigation of traffic impacts under CEQA* or a prior agreement with the City. (if a project is not subject to CEQA, then it is not subject to this fee)”

same document, FEE SCHEDULE E, page 18, second paragraph · source document ↗
When it is paid

at building permit

“Traffic impact fees will not be collected at the time of building permit issuance for a shell building, but will be collected at the time of issuance of the building permit for tenant improvements and will be charged at the rate in effect at the time of that permit.”

same document, FEE SCHEDULE E — "Traffic Impact Fees—General Information", page 14, "General Notes:" · source document ↗
Who collects it

City of West Sacramento — Engineering Division, the agency that levies it

“City of West Sacramento Engineering Division / FEE SCHEDULE E (continued) / TRAFFIC IMPACT FEES—I-5 SUBREGIONAL CORRIDOR MITIGATION IN LIEU FEE”

same document, running header and section title, page 18 · source document ↗
Who is exempt

“* Under SB375, Transit Priority Projects (TPPs) meeting the qualifications below are eligible for CEQA exemption, or CEQA streamlining, in which case they need not consider project-specific or cumulative impacts from cars and light-duty trucks generated by the project, and are therefore exempt from the Fee. / To be considered a TPP, a project must meet the following conditions: 1) Contains at least 50% residential use based on total building square footage, and if the project contains between 26% and 50% non-residential uses, a floor area ratio (FAR) of not less than 0.75; 2) Provides a minimum net density of 20 dwelling units per acre; 3) Is within a Transit Priority Project Area (TPP Area), meaning it is within ½ mile of a major transit stop or high-quality transit corridor; 4) Is consistent with the general use designation, density, building intensity, and applicable policies of certain sustainable community strategies (SCS) or alternative planning strategies (APS) determined to reduce greenhouse gas (GHG) emissions. / TPPs which meet all of the conditions above will be exempt from the Fee.”

same document, FEE SCHEDULE E, page 18 · source document ↗
Credits and offsets

“Credit against traffic impact fees shall be provided when a building permit for demolition of a previous structure of similar use on the same lot has been obtained within the five years previous to building permit issuance for a new structure.”

same document, FEE SCHEDULE E — "Traffic Impact Fees—General Information", page 14, "General Notes:" · source document ↗

Every published rate

Every rate below applies to single-family detached.

House sizeBasisEffectiveAmount
—
>2,500 sf per DU — $1,833
the line this rate was read from

“Residential Greater than 2,500 sf 210.04 DU $1,832.63 [DISTRICT 1] $1,608.11 [DISTRICT 2]" — the $1,832.63 is the DISTRICT 1 column”

same schedule, page 19, "UNIT: DU" · source document ↗
1,101-2,500 sfthis home per DU — $1,575

“Residential 1,101 to 2,500 sf 210.03 DU $1,575.06 [DISTRICT 1] $1,382.45 [DISTRICT 2]" — the $1,575.06 is the DISTRICT 1 column”

same schedule, page 19, "UNIT: DU" · source document ↗
701-1,100 sf per DU — $1,382
the line this rate was read from

“Residential 1,101 to 2,500 sf 210.03 DU $1,575.06 [DISTRICT 1] $1,382.45 [DISTRICT 2]" — the $1,575.06 is the DISTRICT 1 column”

same schedule, page 19, "UNIT: DU" · source document ↗
<=700 sf per DU — $964.18
the line this rate was read from

“Residential 700 sf or less 210.01 DU $ 964.18 [DISTRICT 1] $ 835.40 [DISTRICT 2]" — the $964.18 is the DISTRICT 1 column”

same schedule, page 19, "UNIT: DU" · source document ↗
Low district
>2,500 sf per DU — $1,608
the line this rate was read from

“Residential Greater than 2,500 sf 210.04 DU $1,832.63 [DISTRICT 1] $1,608.11 [DISTRICT 2]" — the $1,832.63 is the DISTRICT 1 column”

same schedule, page 19, "UNIT: DU" · source document ↗
1,101-2,500 sf per DU — $1,382
the line this rate was read from

“Residential 1,101 to 2,500 sf 210.03 DU $1,575.06 [DISTRICT 1] $1,382.45 [DISTRICT 2]" — the $1,575.06 is the DISTRICT 1 column”

same schedule, page 19, "UNIT: DU" · source document ↗
701-1,100 sf per DU — $1,222
the line this rate was read from

“Residential 701 to 1,100 sf 210.02 DU $1,382.45 [DISTRICT 1] $1,221.75 [DISTRICT 2]" — the $1,382.45 is the DISTRICT 1 column for the 701 to 1,100 sf band”

same schedule, page 19, "UNIT: DU" · source document ↗
<=700 sf per DU — $835.40
the line this rate was read from

“Residential 700 sf or less 210.01 DU $ 964.18 [DISTRICT 1] $ 835.40 [DISTRICT 2]" — the $964.18 is the DISTRICT 1 column”

same schedule, page 19, "UNIT: DU" · source document ↗

About these figures

Quoted, not summarized. Every amount and fact on this page is copied from the official document it links to. If we couldn’t find something in a document, we leave it blank instead of guessing.

Before any discounts. Some fees offer credits, waivers or phase-ins. They’re listed above but not subtracted, because whether you qualify depends on your project.

Check the date. Fees change. This page shows what was in force on the date at the top, with a link to the document that set it, so you can confirm the current amount yourself. How all of this is put together.

↑↓ navigate↵ openesc close