SDCWA System Capacity and Water Treatment Capacity Charges

Levied by San Diego County Water Authority on new development in San Diego. Authorized under the Gov. Code Sec. 66013 where the charge is for water or sewer capacity; otherwise the district's own enabling act (Health & Safety Code / Pub. Resources Code, by district type). Collected at building permit.

What one house pays

$6,542

For a typical home: a 2,000 sq ft detached house on a 0.13 acre lot, on a new subdivision lot.

Share of San Diego's total
12%
Total one-time fees here
$56,428
Adjustment
Adjusts yearly · a fixed percentage
what the document says

administratively adjusted annually (+2.0-2.2% for CY2026)

Next expected change
1 Jul 2027 rate on file is stale
!

A scheduled adjustment has passed since this rate took effect

This fee escalates annually. The rate on file is effective 1 Jan 2025, and at least one adjustment has fallen due since. The current amount is probably different, and for an indexed fee almost certainly higher. The next change after that is expected 1 Jul 2027.

The figure is published as held rather than projected forward, because a number computed from an index is not a number quoted from an adopted schedule. It is flagged so you can check the agency's current schedule before relying on it.

The record

Why it exists

“System Capacity Charges Cover Conveyance, Storage — The System Capacity Charge is the cost for the conveyance and storage facilities necessary to operate the delivery system.”

SDCWA, "Capacity Charges", page modified 2026-06-29, opening heading and first sentence · source document ↗
What it pays for

“The System Capacity Charge is the cost for the conveyance and storage facilities necessary to operate the delivery system. The Water Treatment Capacity Charge is the cost for the connection to the Twin Oaks Valley Water Treatment plant.”

SDCWA, "Capacity Charges", page modified 2026-06-29, intro paragraph · source document ↗
Where it applies

“97-1 | Fix Capacity Charges on Ultimate Users of Water from the San Diego County Water Authority”

SDCWA, "Capacity Charges", page modified 2026-06-29, tab "Ordinances", row 97-1 · source document ↗
When it was adopted

2025-06-26

“PASSED, APPROVED AND ADOPTED, this 26th day of June, 2025”

Ordinance No. 2025-02, San Diego County Water Authority, adoption clause, p. 8 · source document ↗
Who adopted it

Ordinance No. 2025-02

“PASSED, APPROVED AND ADOPTED, this 26th day of June, 2025”

Ordinance No. 2025-02, San Diego County Water Authority, adoption clause, p. 8 · source document ↗
When it is paid

at building permit

“CWA charges a CWA Water System capacity fee and a Water Treatment Capacity fee when a new water meter is installed. These fees are based on the size of the water meter to be installed. If a water meter is required as a result of building plans, the fee will be collected at the time of building permit issuance.”

City of San Diego Public Utilities Department, Information Bulletin "Schedule for Water and Sewer Fees", December 2021, s. VIII "COUNTY WATER AUTHORITY (CWA)", p. 3 · source document ↗
Who collects it

the member agency — in this jurisdiction the City of San Diego Public Utilities Department

“90-2 | Permit the Water Authority to Fix and Impose Capacity Charges upon the Ultimate Users of Water Delivered, and to Require its Member Agencies to Collect the Charges on Behalf of the Water Authority”

SDCWA, "Capacity Charges", page modified 2026-06-29, tab "Ordinances", row 90-2 · source document ↗
Who is exempt

“The Water Treatment Capacity Charge excludes customers from the cities of Escondido, Poway, and Del Mar, which cannot be served by the Twin Oaks plant.”

SDCWA, "Capacity Charges", page modified 2026-06-29, intro paragraph, fourth sentence · source document ↗
Credits and offsets

“Credit for Existing Meter If the Applicant wants to increase the size of a water meter serving the property, and if the member agency determines a larger size meter is appropriate, credit of capacity charge at the current rate for the existing meter will be applied, whether any capacity charge for the existing meter was in effect when it was obtained. However, no credit or refund shall be made if the credit for the existing meter exceeds the total capacity charge for the new meter(s).”

San Diego County Water Authority, "Capacity Charge Form", Rev 10/3/2016, p. 2 "Instructions for Completing SDCWA Capacity Charge Form", Part B · source document ↗

Every published rate

Every rate below applies to single-family detached.

ComponentBasisEffectiveAmount
under 1 inch per meter 1 Jan 2025 $6,364
under 1 inch per meter 1 Jan 2025 $178.00

About these figures

Quoted, not summarized. Every amount and fact on this page is copied from the official document it links to. If we couldn’t find something in a document, we leave it blank instead of guessing.

Before any discounts. Some fees offer credits, waivers or phase-ins. They’re listed above but not subtracted, because whether you qualify depends on your project.

Check the date. Fees change. This page shows what was in force on the date at the top, with a link to the document that set it, so you can confirm the current amount yourself. How all of this is put together.