Joshua Basin WD water capacity charge and meter connection fee

Levied by Joshua Basin Water District on new development in San Bernardino County (unincorporated). Collected other: as a condition of initiating service (new connection); the study calls them "one-time fees paid up-front as a condition of development", and the Rules require payment of all pertinent fees before water service is initiated. No document states a building-permit or occupancy trigger.

What one house pays

$14,048

This fee is not in San Bernardino County (unincorporated)'s published figure. This site publishes a home outside any plan area, and this charge applies only in Joshua Tree (Joshua Basin Water District). The amount shown is what it costs a house that is there.

Total one-time fees here
$41,274
Adjustment
Adjusts yearly · ENR construction cost index
what the document says

ENR-CCI annual

Next expected change
1 Jul 2027 rate on file is stale
!

A scheduled adjustment has passed since this rate took effect

This fee escalates annually. The rate on file is effective 1 Jan 2026, and at least one adjustment has fallen due since. The current amount is probably different, and for an indexed fee almost certainly higher. The next change after that is expected 1 Jul 2027.

The figure is published as held rather than projected forward, because a number computed from an index is not a number quoted from an adopted schedule. It is flagged so you can check the agency's current schedule before relying on it.

The record

Why it exists

“WHEREAS, water capacity charges are charges imposed for either the use of water infrastructure existing at the time the charge is imposed or new water infrastructure to be acquired or constructed in the future that has of proportional benefit to the person or property being charged, including supply or capacity contracts for rights or entitlements, real property interests, and entitlements and other rights of JBWD involving capital expenses relating to its use of existing or new water facilities; and WHEREAS, the Study was prepared to assure that the capacity charges reflect the linkage between the charges and the benefits received by new customers and do not exceed the proportional share of costs associated with providing service”

Resolution No. 23-1055, 2023-06-07, recitals, p.1 · source document ↗
What it pays for

“The Water Capacity Charge includes a buy-in component to existing facilities which achieves equity with current customers. In addition, there is a replacement component, which is designed to fund water system capacity replacement required as a result of the new water service.”

JBWD Rules & Regulations, updated 08.25.26, Article 13.19 Water Capacity Charges, p.87 · source document ↗
Where it applies

“Joshua Basin Water District (JBWD or District) provides water service to roughly 5,600 homes, businesses, and properties within a 96-square-mile service area in the community of Joshua Tree, California. The District is located about 125 miles east of Los Angeles in San Bernardino County, to the north of Joshua Tree National Park.”

Water Capacity Charge Study, April 2023, s.1 Background & Objectives, p.1 · source document ↗
When it was adopted

2023-06-07 (water capacity charge, Reso. 23-1055) ; 2025-12-17 (meter connection fee estimates, Reso. 25-1080)

“RESOLUTION NO. 25-1080 RESOLUTION OF THE BOARD OF DIRECTORS OF THE JOSHUA BASIN WATER DISTRICT UPDATING METER CONNECTION METHODOLOGY AND FEES ESTIMATES ... PASSED, APPROVED AND ADOPTED this 17th day of December, 2025 by the Joshua Basin Water District Board of Directors”

Resolution No. 25-1080, adopted 2025-12-17, p.1 and signature page · source document ↗
Who adopted it

Resolution No. 23-1055 ; Resolution No. 25-1080

“RESOLUTION NO. 25-1080 RESOLUTION OF THE BOARD OF DIRECTORS OF THE JOSHUA BASIN WATER DISTRICT UPDATING METER CONNECTION METHODOLOGY AND FEES ESTIMATES ... PASSED, APPROVED AND ADOPTED this 17th day of December, 2025 by the Joshua Basin Water District Board of Directors”

Resolution No. 25-1080, adopted 2025-12-17, p.1 and signature page · source document ↗
When it is paid

“The capacity charges for water service within JBWD are hereby adopted as set forth in Exhibit A, which is attached hereto and incorporated herein by this reference, and said charges shall be imposed only as a condition of either initiating service (new connection) upon the request of a proposed new customer, or extending service upon the request of an existing customer constructing an Attached and/or Detached ADU.”

Resolution No. 23-1055, 2023-06-07, s.3 · source document ↗
Who collects it

Joshua Basin Water District, the agency that levies it

“JBWD levies Water Capacity Charges on new connections to the District's water system. These charges are one-time fees paid up-front as a condition of development and are designed to recover the costs of water system infrastructure and assets benefiting new development. These charges are also sometimes referred to as "connection fees", "facilities fees" or "impact fees".”

Water Capacity Charge Study, April 2023, s.1, p.1 · source document ↗
Who is exempt

“Attached ADUs. For an Attached ADU, JBWD will neither: (i) require the applicant to install a new or separate connection directly between the ADU and the water system; nor (ii) impose a capacity charge, unless the ADU is constructed along with a new SFDU”

Resolution No. 23-1055, 2023-06-07, s.4 · source document ↗
Credits and offsets

“Customers shall be responsible for the actual costs incurred for installation work. The cost estimate requirement below best reflects the anticipated maximum cost of service. Refunds will be issued where cost estimate paid exceeds actual cost. Due to unique District terrain, the District reserves the right to (1) increase the cost estimate requirements in the event of known conditions that will increase the estimated actual costs; and (2) bill customer for any additional costs incurred in the field over and above the cost estimate paid to avoid subsidizing non-standard conditions”

Resolution No. 25-1080, 2025-12-17, Exhibit A, Article 14.18, TRACT METER CONNECTION FEE DEPOSIT · source document ↗

Every published rate

Land useApplies toBasisEffectiveAmount
—
Single-family detached unverified per meter 1 Jan 2026 $13,060
the line this rate was read from

“Capacity Charges Escalation Effective 01/01/2026 ... 2) Water Capacity Reso. 23-1055 ... 1\" Meter: Short-side, Unpaved (SSU) ... $13,060”

JBWD RATE and FEE SCHEDULE (2 pages), Published 08/20/2026, p.2, development-charge table, column "2 · source document ↗
Single-family detached unverified per meter 1 Jan 2026 $988.00
the line this rate was read from

“Meter Connection Fee Estimate (Effective 01/01/2026), Resolution 25-1080 ... 1a) Tract Connection Cost Estimate ... 1\" Meter: Short-side, Unpaved (SSU) ... $988”

JBWD RATE and FEE SCHEDULE (2 pages), Published 08/20/2026, p.2, column "1a · source document ↗
none
ADU "ADU subject to Capacity fee**** Per plumbing fixture unit" per plumbing fixture unit — $816.00
the line this rate was read from

“ADU subject to Capacity fee**** Per plumbing fixture unit | N/A | N/A | N/A | 14.19 | $816.00 per plumbing fixture unit | $7,221 | 14.19.1" and footnote "****SEE RULES & REGULATIONS FOR SPECIFICS ON SUBJECT ADU'S.”

the levying document · source document ↗

About these figures

Quoted, not summarized. Every amount and fact on this page is copied from the official document it links to. If we couldn’t find something in a document, we leave it blank instead of guessing.

Before any discounts. Some fees offer credits, waivers or phase-ins. They’re listed above but not subtracted, because whether you qualify depends on your project.

Check the date. Fees change. This page shows what was in force on the date at the top, with a link to the document that set it, so you can confirm the current amount yourself. How all of this is put together.