WaterSet by special district feeCitation CVWD Code Ch. 3.05 App. A-14 (Ord. 1399.18, 2025)

CVWD Water System Backup Facilities Charge

Levied by Coachella Valley Water District on new development in Palm Desert. Authorized under the Gov. Code Sec. 66013 where the charge is for water or sewer capacity; otherwise the district's own enabling act (Health & Safety Code / Pub. Resources Code, by district type). Collected other: prior to the District issuing the first meter to the development.

What one house pays

$3,757

For a typical home: a 2,000 sq ft detached house on a 0.13 acre lot, on a new subdivision lot — this fee varies by the row that applies, so see the full schedule below.

Share of Palm Desert's total
18%
Total one-time fees here
$20,934
Adjustment
Adjusts only when the board sets a new amount
what the document says

by ordinance — the amount is fixed in Ch. 3.05 App. A-14 and moves only when the Board amends the appendix; no index, formula or automatic adjustment is named anywhere in the chapter

The record

Why it exists

“The purpose of the WSBFC is to mitigate the impacts of new development by funding construction of 'backup' water facilities, which include District infrastructure (wells, treatment, reservoirs, transmission mains, etc.) that support water delivery for new customers.”

Cost of Service Study, Water System Backup Facilities Charge, FINAL – October 2021, s. 1 Introduction, p. 4 of 27 · source document ↗
What it pays for

“The DU/BUC provides funds to construct backup facilities to maintain domestic water service to new developments at peak day flow conditions.”

CVWDC 3.05.130(B), "Dwelling Unit/Building Unit Charge (DU/BUC)" · source document ↗
Where it applies

“The WSBFC is assessed on all new development and redevelopment projects within the district's service area.”

CVWDC 3.05.130(A), "General" · source document ↗
When it was adopted

“Since 1978, with the passage of Proposition 13, capital construction costs for new domestic water service infrastructure have been borne by developers through the WSBFC. The WSBFC is assessed on all new development and redevelopment projects within the district's service area.”

Coachella Valley Water District Code 3.05.130, "Water system backup facilities charge (WSBFC)", subsection A "General"; code current through Ord. 1443 and legislation passed through May 27, 2026 · source document ↗
When it is paid

other: prior to the District issuing the first meter to the development

“The DU/BUC and meter surcharge and other charges as may be required shall be paid prior to the district issuing the first meter to the development.”

CVWDC 3.05.130(D), "Payment" · source document ↗
Who collects it

Coachella Valley Water District, the agency that levies it

“If all the information is complete and the landscape plans have been approved by Water Management, we will be able to provide an invoice of all fees. All fees must be paid, prior to installation of services.”

CVWD Engineering, "How to Obtain Residential Domestic Water Service from the Coachella Valley Water District", steps 7-8 · source document ↗
Credits and offsets

“The district may also apply a credit against a development's specific DUC sub-components if off-site and/or regional infrastructure is built or a funding contribution is made to a district backup facility. The credit shall not exceed the total specific sub-component amount of the DUC for the development.”

CVWDC 3.05.130(D), "Payment" · source document ↗

Every published rate

Land useApplies toBasisEffectiveAmount
—
Single-family detached this home per DU 1 Jan 2025 $3,757

“For single-family residential units and equivalent dwelling units, the DU/BUC is $3,757.”

Ch. 3.05 App. A-14, subsection "Dwelling Unit/Building Unit Charge (DU/BUC)"; Ord. 1399.18 § A-14, 2025 · source document ↗
Single-family detached nonpotable water used per DU 1 Jan 2025 $1,503
the line this rate was read from

“DU/BUC with Maximum Reduction for 60% NPW | $1,503”

Ch. 3.05 App. A-14, Table A-14-1, second row; Ord. 1399.18 § A-14, 2025 · source document ↗
n/a
Mobile home 0.67 EDU per unit — $2,517
the line this rate was read from

“Mobile Home Units (0.67 EDU). For mobile home units, the DUC is assessed at $2,517 per unit.”

the levying document · source document ↗

About these figures

Quoted, not summarized. Every amount and fact on this page is copied from the official document it links to. If we couldn’t find something in a document, we leave it blank instead of guessing.

Before any discounts. Some fees offer credits, waivers or phase-ins. They’re listed above but not subtracted, because whether you qualify depends on your project.

Check the date. Fees change. This page shows what was in force on the date at the top, with a link to the document that set it, so you can confirm the current amount yourself. How all of this is put together.

↑↓ navigate↵ openesc close