Sewer - treatmentSet by connection chargeCitation Oceanside City Code Ch. 37 s.37.56.1 and Ch. 29 s.29.11.1

Wastewater system capacity buy-in fee

Levied by City of Oceanside (Water Utilities Department) on new development in Oceanside. Collected at building permit.

What one house pays

$10,035

For a typical home: a 2,000 sq ft detached house on a 0.13 acre lot, on a new subdivision lot — this fee varies by the row that applies, so see the full schedule below.

Share of Oceanside's total
21%
Total one-time fees here
$48,046
Adjustment
Adjusts only when the board sets a new amount
what the document says

by ordinance amending Code s. 29.11.1 — the section prints fixed dollar amounts and names no index; the 2025 fee study RECOMMENDS annual ENR-CCI adjustment but no adopted instrument stating that was reached. [no index named]

Next expected change
1 Jul 2027

The record

Why it exists

“Wastewater System Capacity Fees recover the cost of facilities for the collection, transportation, treatment, and disposal of wastewater.”

2025 Water and Wastewater System Capacity Fees Report, April 2025 FINAL · source document ↗
What it pays for

“System capacity fees, sometimes referred to as impact fees or system development charges, are one-time fees assessed on new system connections for water and/or wastewater service.”

2025 Capacity Fees Report, April 2025 · source document ↗
Where it applies

“all new connections to the city's wastewater system shall be assessed a wastewater system capacity buy-in fee based on water meter size, except residential single-family connections, which will be charged for a 5/8-inch meter regardless of water meter size”

Oceanside City Code § 29.11.1 · source document ↗
When it was adopted

1974-02-13 (section origin); present buy-in fee structure 2015-08-05

“(Ord. No. 74-5, § 1, 2-13-74; Ord. No. 77-22, § 1, 6-22-77; Ord. No. 81-34, § 4, 6-3-81; Ord. No. 99-20, § 3, 10-20-99; Ord. No. 02-OR333-1, § 1, 5-8-02; Ord. No. 05-OR0610-1, § 1, 10-5-05; Ord. No. 07-OR0632-1, §§ 2, 3, 10-3-07; Ord. No. 09-OR0092-1, §§ 1, 2, 2-11-09; Ord. No. 15-OR0479-1, §§ 1, 2, 8-5-2015)”

Oceanside City Code § 29.11.1, ordinance history note at end of section · source document ↗
Who adopted it

Ordinance No. 15-OR0479-1 (current amounts set by Ord. No. 25-OR0380-1)

“(Ord. No. 74-5, § 1, 2-13-74; Ord. No. 77-22, § 1, 6-22-77; Ord. No. 81-34, § 4, 6-3-81; Ord. No. 99-20, § 3, 10-20-99; Ord. No. 02-OR333-1, § 1, 5-8-02; Ord. No. 05-OR0610-1, § 1, 10-5-05; Ord. No. 07-OR0632-1, §§ 2, 3, 10-3-07; Ord. No. 09-OR0092-1, §§ 1, 2, 2-11-09; Ord. No. 15-OR0479-1, §§ 1, 2, 8-5-2015)”

Oceanside City Code § 29.11.1, ordinance history note at end of section · source document ↗
When it is paid

at building permit

“(c) Impact fees shall be calculated and collected at the time of issuance of a building permit for all development projects. The calculation of impact fees due shall be based upon the impact fee schedule in effect at the time of issuance of a building permit." / "(d) No building permit shall be issued until all impact fees due for the development project have been paid.”

Oceanside City Code § 32B.7, Imposition, calculation and collection of impact fees; Ord. No. 18-OR0479-1, 9-19-2018 · source document ↗
Who collects it

City of Oceanside (Water Utilities Department), the agency that levies it

“Imposition, Calculation & Collection of Impact Fees Oceanside City Code, Chapter 32, Sec. 32B.7, Ord. No. 02-OR331-1”

City of Oceanside Water Utilities Department, Water Utilities Buy In Fees, "Fees effective July 1, 2026", CITY CODES & ORDINANCES FOR FEES block · source document ↗

Every published rate

Land useApplies toBasisEffectiveAmount
none
Multi-family 8" per connection — $802,782
the line this rate was read from

“8\" | $ 802,782”

the levying document · source document ↗
Multi-family 6" per connection — $501,740
the line this rate was read from

“6\" | $ 501,740”

the levying document · source document ↗
Multi-family 4" per connection — $250,870
the line this rate was read from

“4\" | $ 250,870”

the levying document · source document ↗
Multi-family 3" per connection — $150,522
the line this rate was read from

“3\" | $ 150,522”

the levying document · source document ↗
Multi-family 2" per connection — $80,279
the line this rate was read from

“Multi-family & Non-residential | 2\" | $ 80,279”

the levying document · source document ↗
Multi-family 1-1/2" per connection — $50,174
the line this rate was read from

“Multi-family & Non-residential | 1-1/2\" | $ 50,174”

the levying document · source document ↗
Multi-family 1" per connection — $25,087
the line this rate was read from

“Multi-family & Non-residential | 1\" | $ 25,087”

the levying document · source document ↗
Multi-family 3/4" per connection — $15,052
the line this rate was read from

“Multi-family & Non-residential | 3/4\" | $ 15,052”

the levying document · source document ↗
—
Single-family detached 5/8 to 2 inch (SFR)this home per DU 1 Jul 2026 $10,035

“Single Family Residential | 5/8\" | $ 10,035 ; 3/4\" | $ 10,035 ; 1\" | $ 10,035 ; 1-1/2\" | $ 10,035 ; 2\" | $ 10,035" (column heading: "WASTEWATER SYSTEM BUY-IN FEES — Meter Size | Wastewater System Capacity Buy-In Fees"; footer: "Fees effective July 1, 2026")”

City of Oceanside Water Utilities Department, Water Utilities Buy In Fees Effective 07-01-2026 · source document ↗

About these figures

Quoted, not summarized. Every amount and fact on this page is copied from the official document it links to. If we couldn’t find something in a document, we leave it blank instead of guessing.

Before any discounts. Some fees offer credits, waivers or phase-ins. They’re listed above but not subtracted, because whether you qualify depends on your project.

Check the date. Fees change. This page shows what was in force on the date at the top, with a link to the document that set it, so you can confirm the current amount yourself. How all of this is put together.