Root Creek WD water connection fee

Levied by Root Creek Water District on new development in Madera County (unincorporated). Authorized under the Gov. Code Sec. 66013 (capacity charge for water or sewer service).

What one house pays

$7,503

This fee is not in Madera County (unincorporated)'s published figure. This site publishes a home outside any plan area, and this charge applies only in Riverstone. The amount shown is what it costs a house that is there.

Total one-time fees here
$39,700
Adjustment
Adjusts ENR construction cost index
what the document says

ENR indexed

The record

Why it exists

“Pursuant to the Code, a connection fee is not a tax or special assessment but is instead a voluntary charge levied to defray the cost of public facilities needed to serve a new development.”

Root Creek Water District 2021 Connection Fee Update, REPORT, October 14, 2021, Section 1, "Connection Fee Legal Requirements", p. 1 · source document ↗
What it pays for

“Revenue generated from bonds and connection fees fund the capital costs to construct municipal water, sewer, and storm drain systems.”

2021 Connection Fee Update, October 14, 2021, Section 1, "Introduction", p. 1 · source document ↗
Where it applies

“At buildout, RCWD will provide municipal water, sewer, and storm drain service to 6,790 equivalent dwelling units in the Riverstone Development.”

2021 Connection Fee Update, October 14, 2021, Section 1, "Introduction", p. 1 · source document ↗
Who collects it

Root Creek Water District, the agency that levies it

“The Root Creek Water District (Root Creek WD, RCWD, or District), which is located in southern Madera County, was formed in 1996 ... the District applied to the Madera County Local Agency Formation Commission to activate RCWD's latent powers to provide potable municipal water supply, wastewater, and stormwater services for the Riverstone Development in 2013.”

2021 Connection Fee Update, October 14, 2021, Section 1, "Introduction", p. 1 · source document ↗
Who is exempt

“The water connection fees only apply to potable water customers. Non-potable customers do not contribute to the need to construct and maintain water treatment and distribution facilities. Thus, non-potable customers are excluded from paying connection fees.”

2021 Connection Fee Update, October 14, 2021, Section 3, p. 11 · source document ↗
How it changes

“To provide affordability it is suggested that the proposed fees be phased-in as shown in Table 2.”

2021 Connection Fee Update, October 14, 2021, Section 1, p. 3; Table 2 "Proposed Phase-in of Residential Connection Fees" reads "Current $4,580 / 2022 $5,954 / 2023 $7,328 / Thereafter + annual inflationary cost increases" in the "Water + MID Fee [1]" column · source document ↗

Every published rate

Land useApplies toBasisEffectiveAmount
Riverstone
Single-family detached per EDU 1 Jan 2025 $7,503
the line this rate was read from

“Medium 5.00 4.50 6.00 7,503.00 (Water Fee per dwelling unit), adopted by motion 2024-11-18 and printed as "RCWD Current" Water $7,503 in the district's 2026 Capacity Fee Update Table 2”

2021 Connection Fee Update, October 14, 2021, Section 3, p. 12, text under Table 12 "Water Connection Fee Schedule"; the Medium row of Table 12 reads "Medium 5 2.00 $29,641 $36,641 $5,928 $7,328" under column headings "Land Use Density / Dwelling Units per Acre (midpoint) / Annual Demand (acre feet per acre) / RCWD Fee per Acre / Total Fee per Acre (RCWD + MID) / RCWD Fee per Dwelling / Total Fee per Unit (RCWD + $1,400 MID)" · source document ↗
Multi-family very high density per unit — $3,808
the line this rate was read from

“Table 14: Proposed 2023 Water Connection Fees ... Multi Family (very high density) per unit | Current Fee $2,405 | Proposed $3,808”

the levying document · source document ↗

About these figures

Quoted, not summarized. Every amount and fact on this page is copied from the official document it links to. If we couldn’t find something in a document, we leave it blank instead of guessing.

Before any discounts. Some fees offer credits, waivers or phase-ins. They’re listed above but not subtracted, because whether you qualify depends on your project.

Check the date. Fees change. This page shows what was in force on the date at the top, with a link to the document that set it, so you can confirm the current amount yourself. How all of this is put together.

↑↓ navigate↵ openesc close