Sewer - collectionSet by special district feeCitation JCSD Resolution No. 2628

JCSD sewer capacity charge

Levied by Jurupa Community Services District on new development in Jurupa Valley. Collected other: "Developer posts deposits and necessary fees with District" — step 10 of the District's development procedure, after plan approval and before the water/sewer construction agreement and Notice to Proceed. NO DOCUMENT FOUND NAMES THE CAPACITY CHARGE'S PAYMENT POINT; this step names fees generally.

What one house pays

$9,992

For a typical home: a 2,000 sq ft detached house on a 0.13 acre lot, on a new subdivision lot.

Share of Jurupa Valley's total
15%
Total one-time fees here
$66,486
Adjustment
Adjusts yearly · ENR construction cost index · July
what the document says

ENR CCI annual

Next expected change
1 Jul 2027

The record

Why it exists

“A Capacity Charge is a charge imposed by the District on new development wishing to connect to the water and/or wastewater systems or on existing users that wish to upsize their connection or increase required capacity within the systems. In order to provide the system capacity and water resources to serve these customers, JCSD has constructed some excess capacity within the existing water and wastewater systems and will be expanding those systems.”

JCSD 2015 Capacity Charges Study, Carollo Engineers, March 2016, s. 2.0 Capacity Charge Overview, report p. 4 · source document ↗
What it pays for

“The Incremental portion of the Capacity Charge is based on the costs of the District's planned projects that provide additional service capacity. ... Types of projects on the CIP include new trunk sewers and pipelines, upgrades or replacements of lift stations and forcemains, and increases to capacity at treatment plants.”

JCSD 2015 Capacity Charges Study, March 2016, s. 5.3 Incremental Portion of the Capacity Charge, report p. 39 · source document ↗
Where it applies

“After a series of expansions throughout its history, JCSD has reached its current 40.8 square mile service area while serving a population of about 120,000 residents in northwest Riverside County.”

JCSD 2015 Capacity Charges Study, March 2016, s. 1.1 History and Services, report p. 1 · source document ↗
Who adopted it

Resolution No. 2628

“SEWER CAPACITY CHARGES (RESOLUTION NO. 2628)”

JCSD "Customer Guide — Rates, Charges, and Deposits", cover "EFFECTIVE JULY 1, 2026", page headed "CAPACITY / INSTALLATION", table heading; no adoption date printed anywhere in the guide · source document ↗
When it is paid

“10. Developer posts deposits and necessary fees with District. 11. Developer enters water, sewer and/or recycled water system construction agreement with District. (Appendix D)”

JCSD Standards Manual for Water and Sewer Systems, 2026 edition, Section I Introduction, s. C General Procedure, p. I-4 · source document ↗
Who collects it

Jurupa Community Services District, the agency that levies it

“All District fees and facilities charges associated with the proposed water, sewer and/or recycled water system shall be paid for by the Developer.”

JCSD Standards Manual, 2026 edition, Section II General Requirements, s. A General, p. II-1 · source document ↗
How it changes

“The developments that have entered into a Security Agreement and have secured their Capacity Charges with a Letter of Credit will not have to pay the updated Capacity Charges presented within this report. In addition, other developments that comply with all of the following requirements would not have to pay the updated Capacity Charges presented within this report : 1. Have been issued a Water Availability Letter ... 2. Are in the plan check process with Development Engineering ... 3. Are eligible to pay or secure their Capacity Charges ... 4. Pay or secure their Capacity Charges before the new fees are effective.”

JCSD 2015 Capacity Charges Study, March 2016, s. 2.2.2 Security Agreements, report p. 10 · source document ↗

Every published rate

Every rate below applies to single-family detached.

RateBasisEffectiveAmount
Bellegrave Ave. (Area B)
per EDU 1 Jul 2026 $13,260
the line this rate was read from

“SEWER CAPACITY CHARGES (RESOLUTION NO. 2628) — Bellegrave Ave. (Area B) | Charge // Per EDU | $13,260”

JCSD Customer Guide — Rates, Charges, and Deposits, cover "EFFECTIVE JULY 1, 2026", page headed "CAPACITY / INSTALLATION", right-hand SEWER CAPACITY CHARGES table · source document ↗
—
this home per EDU 1 Jul 2026 $9,992

“SEWER CAPACITY CHARGES (RESOLUTION NO. 2628) — Sewer Capacity Charge | Charge // Per EDU | $9,992”

JCSD Customer Guide — Rates, Charges, and Deposits, cover "EFFECTIVE JULY 1, 2026", page headed "CAPACITY / INSTALLATION", left-hand SEWER CAPACITY CHARGES table · source document ↗

About these figures

Quoted, not summarized. Every amount and fact on this page is copied from the official document it links to. If we couldn’t find something in a document, we leave it blank instead of guessing.

Before any discounts. Some fees offer credits, waivers or phase-ins. They’re listed above but not subtracted, because whether you qualify depends on your project.

Check the date. Fees change. This page shows what was in force on the date at the top, with a link to the document that set it, so you can confirm the current amount yourself. How all of this is put together.

↑↓ navigate↵ openesc close