The record
“4.101.0. PURPOSE. The Board of Directors hereby declares and finds that the development of land substantially accelerates the concentration of surface and storm waters and that it is necessary to provide for the construction of and establish and collect fees to defray all or a part of the actual or the estimated cost of constructing planned local drainage facilities and improvements for the control and safe disposal of surface and storm waters from local drainage areas in order to promote and protect the public safety, peace, comfort, and convenience and the general welfare”
“4.102.14. PLANNED LOCAL DRAINAGE FACILITIES AND IMPROVEMENTS. "Planned Local Drainage Facilities and Improvements," as used in this Chapter, means drainage facilities, improvements and appurtenances thereto required by the local drainage plan for a local drainage area. The term facilities and improvements shall include, without limitation, conduits, drainage channels, drainage retention and recharge basins, real property and rights in real property and improvements and appurtenances incidental thereto, all as may be required for the control and safe disposal of surface and storm waters from a local drainage area.”
“The rates per gross acre used to compute local drainage fees levied and collected pursuant to this Chapter for parcels of land located in any local drainage area shall be those rates set forth for such local drainage area in the schedule of per-gross-acre fees established by resolution of the Board of Directors as set forth in this section. For parcels of land located, pursuant to the Zoning Ordinance, in the respective zoning districts identified in said schedule of per-gross-acre fees, the per-gross-acre fee shall be the sum identified with such zoning district in such schedule.”
2000-12-20
“Fresno Metropolitan Flood Control District / Ordinance Code: Ordinance 2000-3 / CHAPTER 4 / DRAINAGE FEES ... Date Last Amended: December 20, 2000”
“Fresno Metropolitan Flood Control District / Ordinance Code: Ordinance 2000-3 / CHAPTER 4 / DRAINAGE FEES ... Date Last Amended: December 20, 2000”
“4.103.0. LOCAL DRAINAGE FEES REQUIRED; WHEN PAYABLE. (a) Except as otherwise provided in this section, a local drainage fee shall be paid on each parcel of land in a local drainage area prior to the commencement of the work of any development thereon or, in the case of any division of a parcel of land, prior to the approval of the map or document evidencing the creation of the parcels. The applicable fee shall be that most recently established by the Board of Directors prior to approval of the final subdivision map, or map evidencing the creation of parcels, or issuance of a development permit, whichever shall apply.”
City of Clovis (designated city), collecting on behalf of the District
“4.109.0. TRANSFER OF FUNDS TO DISTRICT. (a) In such cases in which the fees payable under this Chapter are collected on behalf of the District by designated cities or the County, the controller of the city or the Auditor-Controller of the County shall transfer to the District, on the fifteenth (15) day of each month, all local drainage fees collected during the preceding calendar month.”
“(e) Exceptions. Local drainage fees are not payable for the performance of the following items of work: (1) Except in the case of a division, any development work which consists solely of the construction, erection, or installation of: (i) Fences, pole lines, underground conduits, or pipelines, or similar developments which, as determined by the Manager do not materially alter the natural surface of a parcel of land; or (ii) Concrete curbs, gutters, sidewalks, driveway approaches, paving or other street improvements undertaken in the absence of other related development as defined herein, within any street or alley. (2) Any development consisting solely of additions or alterations to any single-family residential dwelling or its accessory buildings or additional development other than additional dwellings on a developed single-family residential parcel. (3) Any reconstruction or replacement of a single-family residence destroyed by fire or because of condemnation”
“4.106.0. CREDITS, REIMBURSEMENTS FOR FEES AND FACILITIES PREVIOUSLY PAID AND INSTALLED. CONDITIONS. (a) In the computation of the local drainage fee payable because of the development or division of any parcel of land, a credit shall be allowed for planned local drainage facilities and improvements dedicated or constructed with respect to such parcel. Such credits are limited to the actual cost of lands dedicated in fee title, or the actual cash expenditures for the construction of local drainage facilities constructed and still in existence and use in any street, alley, or public easement, and not purchased or constructed by special assessment proceeding”
Every published rate
| Land use | Applies to | Basis | Effective | Amount |
|---|---|---|---|---|
| Area DQ | ||||
| Multi-family | column "R-4, T-P" | per gross acre | — | $38,740 |
the line this rate was read from
the levying document · source document ↗
| ||||
| Multi-family | R-3 multifamily | per acre | 1 Mar 2025 | $33,590 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 4, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "DQ", sub-row "TOTAL", column heading "R-3" · source document ↗
| ||||
| Single-family detached | R-1 50% coveragethis home | per acre | 1 Mar 2025 | $30,580 |
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 4, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "DQ", sub-row "TOTAL", column heading "R-1 50%" · source document ↗
| ||||
| Multi-family | column "R-2, M-H"this home | per gross acre | — | $30,580 |
the levying document · source document ↗
| ||||
| Single-family detached | R-1 45% coverage | per acre | 1 Mar 2025 | $29,430 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 4, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "DQ", sub-row "TOTAL", column heading "R-1 45%" · source document ↗
| ||||
| Single-family detached | R-1 40% coverage | per acre | 1 Mar 2025 | $28,230 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 4, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "DQ", sub-row "TOTAL", column heading "R-1 40%" · source document ↗
| ||||
| Area DM | ||||
| Multi-family | column "R-4, T-P" | per gross acre | — | $27,060 |
the line this rate was read from
the levying document · source document ↗
| ||||
| Multi-family | R-3 multifamily | per acre | 1 Mar 2025 | $24,470 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 3, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "DM", sub-row "TOTAL", column heading "R-3" · source document ↗
| ||||
| Single-family detached | R-1 50% coverage | per acre | 1 Mar 2025 | $22,590 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 3, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "DM", sub-row "TOTAL", column heading "R-1 50%" · source document ↗
| ||||
| Multi-family | column "R-2, M-H" | per gross acre | — | $22,590 |
the line this rate was read from
the levying document · source document ↗
| ||||
| Single-family detached | R-1 45% coverage | per acre | 1 Mar 2025 | $21,880 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 3, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "DM", sub-row "TOTAL", column heading "R-1 45%" · source document ↗
| ||||
| Single-family detached | R-1 40% coverage | per acre | 1 Mar 2025 | $21,100 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 3, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "DM", sub-row "TOTAL", column heading "R-1 40%" · source document ↗
| ||||
| Area BY2 | ||||
| Multi-family | column "R-4, T-P" | per gross acre | — | $26,820 |
the line this rate was read from
the levying document · source document ↗
| ||||
| Multi-family | R-3 multifamily | per acre | 1 Mar 2025 | $24,420 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 3, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "BY2", sub-row "TOTAL", column heading "R-3" · source document ↗
| ||||
| Single-family detached | R-1 50% coverage | per acre | 1 Mar 2025 | $22,590 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 3, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "DM", sub-row "TOTAL", column heading "R-1 50%" · source document ↗
| ||||
| Multi-family | column "R-2, M-H" | per gross acre | — | $22,590 |
the line this rate was read from
the levying document · source document ↗
| ||||
| Single-family detached | R-1 45% coverage | per acre | 1 Mar 2025 | $21,920 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 3, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "BY2", sub-row "TOTAL", column heading "R-1 45%" · source document ↗
| ||||
| Single-family detached | R-1 40% coverage | per acre | 1 Mar 2025 | $21,140 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 3, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "BY2", sub-row "TOTAL", column heading "R-1 40%" · source document ↗
| ||||
| Area DL | ||||
| Multi-family | column "R-4, T-P" | per gross acre | — | $24,570 |
the line this rate was read from
the levying document · source document ↗
| ||||
| Multi-family | R-3 multifamily | per acre | 1 Mar 2025 | $21,800 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 3, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "DL", sub-row "TOTAL", column heading "R-3" · source document ↗
| ||||
| Single-family detached | R-1 50% coverage | per acre | 1 Mar 2025 | $19,990 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 3, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "DL", sub-row "TOTAL", column heading "R-1 50%" · source document ↗
| ||||
| Multi-family | column "R-2, M-H" | per gross acre | — | $19,990 |
the line this rate was read from
the levying document · source document ↗
| ||||
| Single-family detached | R-1 45% coverage | per acre | 1 Mar 2025 | $19,310 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 3, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "DL", sub-row "TOTAL", column heading "R-1 45%" · source document ↗
| ||||
| Single-family detached | R-1 40% coverage | per acre | 1 Mar 2025 | $18,580 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 3, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "DL", sub-row "TOTAL", column heading "R-1 40%" · source document ↗
| ||||
| Area 7H | ||||
| Multi-family | column "R-4, T-P" | per gross acre | — | $23,750 |
the line this rate was read from
the levying document · source document ↗
| ||||
| Multi-family | R-3 multifamily | per acre | 1 Mar 2025 | $21,010 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 4, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "7H", sub-row "TOTAL", column heading "R-3" · source document ↗
| ||||
| Single-family detached | R-1 50% coverage | per acre | 1 Mar 2025 | $19,260 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 4, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "7H", sub-row "TOTAL", column heading "R-1 50%" · source document ↗
| ||||
| Multi-family | column "R-2, M-H" | per gross acre | — | $19,260 |
the line this rate was read from
the levying document · source document ↗
| ||||
| Single-family detached | R-1 45% coverage | per acre | 1 Mar 2025 | $18,610 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 4, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "7H", sub-row "TOTAL", column heading "R-1 45%" · source document ↗
| ||||
| Single-family detached | R-1 40% coverage | per acre | 1 Mar 2025 | $17,890 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 4, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "7H", sub-row "TOTAL", column heading "R-1 40%" · source document ↗
| ||||
| Area AQ | ||||
| Multi-family | column "R-4, T-P" | per gross acre | — | $21,820 |
the line this rate was read from
the levying document · source document ↗
| ||||
| Multi-family | R-3 multifamily | per acre | 1 Mar 2025 | $19,610 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 3, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "AQ", sub-row "TOTAL", column heading "R-3" · source document ↗
| ||||
| Single-family detached | R-1 50% coverage | per acre | 1 Mar 2025 | $18,050 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 3, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "AQ", sub-row "TOTAL", column heading "R-1 50%" · source document ↗
| ||||
| Multi-family | column "R-2, M-H" | per gross acre | — | $18,050 |
the line this rate was read from
the levying document · source document ↗
| ||||
| Single-family detached | R-1 45% coverage | per acre | 1 Mar 2025 | $17,480 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 3, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "AQ", sub-row "TOTAL", column heading "R-1 45%" · source document ↗
| ||||
| Single-family detached | R-1 40% coverage | per acre | 1 Mar 2025 | $16,840 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 3, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "AQ", sub-row "TOTAL", column heading "R-1 40%" · source document ↗
| ||||
| Area DP | ||||
| Multi-family | column "R-4, T-P" | per gross acre | — | $21,680 |
the line this rate was read from
the levying document · source document ↗
| ||||
| Multi-family | R-3 multifamily | per acre | 1 Mar 2025 | $19,530 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 3, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "DP", sub-row "TOTAL", column heading "R-3" · source document ↗
| ||||
| Single-family detached | R-1 50% coverage | per acre | 1 Mar 2025 | $18,010 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 3, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "DP", sub-row "TOTAL", column heading "R-1 50%" · source document ↗
| ||||
| Multi-family | column "R-2, M-H" | per gross acre | — | $18,010 |
the line this rate was read from
the levying document · source document ↗
| ||||
| Single-family detached | R-1 45% coverage | per acre | 1 Mar 2025 | $17,430 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 3, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "DP", sub-row "TOTAL", column heading "R-1 45%" · source document ↗
| ||||
| Single-family detached | R-1 40% coverage | per acre | 1 Mar 2025 | $16,800 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 3, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "DP", sub-row "TOTAL", column heading "R-1 40%" · source document ↗
| ||||
| Area BT | ||||
| Multi-family | column "R-4, T-P" | per gross acre | — | $20,670 |
the line this rate was read from
the levying document · source document ↗
| ||||
| Multi-family | R-3 multifamily | per acre | 1 Mar 2025 | $18,440 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 3, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "BT", sub-row "TOTAL", column heading "R-3" · source document ↗
| ||||
| Single-family detached | R-1 50% coverage | per acre | 1 Mar 2025 | $16,940 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 3, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "BT", sub-row "TOTAL", column heading "R-1 50%" · source document ↗
| ||||
| Multi-family | column "R-2, M-H" | per gross acre | — | $16,940 |
the line this rate was read from
the levying document · source document ↗
| ||||
| Single-family detached | R-1 45% coverage | per acre | 1 Mar 2025 | $16,390 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 3, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "BT", sub-row "TOTAL", column heading "R-1 45%" · source document ↗
| ||||
| Single-family detached | R-1 40% coverage | per acre | 1 Mar 2025 | $15,770 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 3, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "BT", sub-row "TOTAL", column heading "R-1 40%" · source document ↗
| ||||
| Area BC | ||||
| Multi-family | column "R-4, T-P" | per gross acre | — | $14,220 |
the line this rate was read from
the levying document · source document ↗
| ||||
| Multi-family | R-3 multifamily | per acre | 1 Mar 2025 | $12,610 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 3, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "BC", sub-row "TOTAL", column heading "R-3" · source document ↗
| ||||
| Single-family detached | R-1 50% coverage | per acre | 1 Mar 2025 | $11,560 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 3, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "BC", sub-row "TOTAL", column heading "R-1 50%" · source document ↗
| ||||
| Multi-family | column "R-2, M-H" | per gross acre | — | $11,560 |
the line this rate was read from
the levying document · source document ↗
| ||||
| Single-family detached | R-1 45% coverage | per acre | 1 Mar 2025 | $11,170 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 3, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "BC", sub-row "TOTAL", column heading "R-1 45%" · source document ↗
| ||||
| Single-family detached | R-1 40% coverage | per acre | 1 Mar 2025 | $10,740 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 3, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "BC", sub-row "TOTAL", column heading "R-1 40%" · source document ↗
| ||||
| Area DO | ||||
| Multi-family | column "R-4, T-P" | per gross acre | — | $13,580 |
the line this rate was read from
the levying document · source document ↗
| ||||
| Multi-family | R-3 multifamily | per acre | 1 Mar 2025 | $11,950 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 3, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "DO", sub-row "TOTAL", column heading "R-3" · source document ↗
| ||||
| Single-family detached | R-1 50% coverage | per acre | 1 Mar 2025 | $10,940 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 3, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "DO", sub-row "TOTAL", column heading "R-1 50%" · source document ↗
| ||||
| Multi-family | column "R-2, M-H" | per gross acre | — | $10,940 |
the line this rate was read from
the levying document · source document ↗
| ||||
| Single-family detached | R-1 45% coverage | per acre | 1 Mar 2025 | $10,550 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 3, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "DO", sub-row "TOTAL", column heading "R-1 45%" · source document ↗
| ||||
| Single-family detached | R-1 40% coverage | per acre | 1 Mar 2025 | $10,140 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 3, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "DO", sub-row "TOTAL", column heading "R-1 40%" · source document ↗
| ||||
| Area BX | ||||
| Multi-family | column "R-4, T-P" | per gross acre | — | $12,420 |
the line this rate was read from
the levying document · source document ↗
| ||||
| Multi-family | R-3 multifamily | per acre | 1 Mar 2025 | $11,030 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 3, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "BX", sub-row "TOTAL", column heading "R-3" · source document ↗
| ||||
| Single-family detached | R-1 50% coverage | per acre | 1 Mar 2025 | $10,120 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 3, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "BX", sub-row "TOTAL", column heading "R-1 50%" · source document ↗
| ||||
| Multi-family | column "R-2, M-H" | per gross acre | — | $10,120 |
the line this rate was read from
the levying document · source document ↗
| ||||
| Single-family detached | R-1 45% coverage | per acre | 1 Mar 2025 | $9,780 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 3, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "BX", sub-row "TOTAL", column heading "R-1 45%" · source document ↗
| ||||
| Single-family detached | R-1 40% coverage | per acre | 1 Mar 2025 | $9,400 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 3, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "BX", sub-row "TOTAL", column heading "R-1 40%" · source document ↗
| ||||
| Area 3G | ||||
| Multi-family | column "R-4, T-P" | per gross acre | — | $12,280 |
the line this rate was read from
the levying document · source document ↗
| ||||
| Multi-family | R-3 multifamily | per acre | 1 Mar 2025 | $10,760 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 4, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "3G", sub-row "TOTAL", column heading "R-3" · source document ↗
| ||||
| Single-family detached | R-1 50% coverage | per acre | 1 Mar 2025 | $9,830 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 4, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "3G", sub-row "TOTAL", column heading "R-1 50%" · source document ↗
| ||||
| Multi-family | column "R-2, M-H" | per gross acre | — | $9,830 |
the line this rate was read from
the levying document · source document ↗
| ||||
| Single-family detached | R-1 45% coverage | per acre | 1 Mar 2025 | $9,480 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 4, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "3G", sub-row "TOTAL", column heading "R-1 45%" · source document ↗
| ||||
| Single-family detached | R-1 40% coverage | per acre | 1 Mar 2025 | $9,100 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 4, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "3G", sub-row "TOTAL", column heading "R-1 40%" · source document ↗
| ||||
| Area 7D | ||||
| Multi-family | column "R-4, T-P" | per gross acre | — | $12,280 |
the line this rate was read from
the levying document · source document ↗
| ||||
| Multi-family | R-3 multifamily | per acre | 1 Mar 2025 | $10,580 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 4, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "7D", sub-row "TOTAL", column heading "R-3" · source document ↗
| ||||
| Single-family detached | R-1 50% coverage | per acre | 1 Mar 2025 | $9,610 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 4, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "7D", sub-row "TOTAL", column heading "R-1 50%" · source document ↗
| ||||
| Multi-family | column "R-2, M-H" | per gross acre | — | $9,610 |
the line this rate was read from
the levying document · source document ↗
| ||||
| Single-family detached | R-1 45% coverage | per acre | 1 Mar 2025 | $9,230 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 4, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "7D", sub-row "TOTAL", column heading "R-1 45%" · source document ↗
| ||||
| Single-family detached | R-1 40% coverage | per acre | 1 Mar 2025 | $8,840 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 4, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "7D", sub-row "TOTAL", column heading "R-1 40%" · source document ↗
| ||||
| Area 7C | ||||
| Multi-family | column "R-4, T-P" | per gross acre | — | $9,250 |
the line this rate was read from
the levying document · source document ↗
| ||||
| Multi-family | R-3 multifamily | per acre | 1 Mar 2025 | $7,920 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 4, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "7C", sub-row "TOTAL", column heading "R-3" · source document ↗
| ||||
| Single-family detached | R-1 50% coverage | per acre | 1 Mar 2025 | $7,180 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 4, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "7C", sub-row "TOTAL", column heading "R-1 50%" · source document ↗
| ||||
| Multi-family | column "R-2, M-H" | per gross acre | — | $7,180 |
the line this rate was read from
the levying document · source document ↗
| ||||
| Single-family detached | R-1 45% coverage | per acre | 1 Mar 2025 | $6,900 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 4, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "7C", sub-row "TOTAL", column heading "R-1 45%" · source document ↗
| ||||
| Single-family detached | R-1 40% coverage | per acre | 1 Mar 2025 | $6,610 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 4, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "7C", sub-row "TOTAL", column heading "R-1 40%" · source document ↗
| ||||
| Zone 3 | ||||
| Multi-family | column "R-4, T-P" | per gross acre | — | $8,560 |
the line this rate was read from
the levying document · source document ↗
| ||||
| Multi-family | R-3 multifamily | per acre | 1 Mar 2025 | $7,440 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 6, table "DRAINAGE FEE SCHEDULE FOR ZONE 3: PLANNED LOCAL DRAINAGE AREAS", Area row "Zone 3", sub-row "TOTAL", column heading "R-3" · source document ↗
| ||||
| Single-family detached | R-1 50% coverage | per acre | 1 Mar 2025 | $6,780 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 6, table "DRAINAGE FEE SCHEDULE FOR ZONE 3: PLANNED LOCAL DRAINAGE AREAS", Area row "Zone 3", sub-row "TOTAL", column heading "R-1 50%" · source document ↗
| ||||
| Multi-family | column "R-2, M-H" | per gross acre | — | $6,780 |
the line this rate was read from
the levying document · source document ↗
| ||||
| Single-family detached | R-1 45% coverage | per acre | 1 Mar 2025 | $6,530 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 6, table "DRAINAGE FEE SCHEDULE FOR ZONE 3: PLANNED LOCAL DRAINAGE AREAS", Area row "Zone 3", sub-row "TOTAL", column heading "R-1 45%" · source document ↗
| ||||
| Single-family detached | R-1 40% coverage | per acre | 1 Mar 2025 | $6,260 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 6, table "DRAINAGE FEE SCHEDULE FOR ZONE 3: PLANNED LOCAL DRAINAGE AREAS", Area row "Zone 3", sub-row "TOTAL", column heading "R-1 40%" · source document ↗
| ||||
| Area BU | ||||
| Multi-family | column "R-4, T-P" | per gross acre | — | $7,700 |
the line this rate was read from
the levying document · source document ↗
| ||||
| Multi-family | R-3 multifamily | per acre | 1 Mar 2025 | $6,970 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 3, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "BU", sub-row "TOTAL", column heading "R-3" · source document ↗
| ||||
| Single-family detached | R-1 50% coverage | per acre | 1 Mar 2025 | $6,430 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 3, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "BU", sub-row "TOTAL", column heading "R-1 50%" · source document ↗
| ||||
| Multi-family | column "R-2, M-H" | per gross acre | — | $6,430 |
the line this rate was read from
the levying document · source document ↗
| ||||
| Single-family detached | R-1 45% coverage | per acre | 1 Mar 2025 | $6,240 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 3, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "BU", sub-row "TOTAL", column heading "R-1 45%" · source document ↗
| ||||
| Single-family detached | R-1 40% coverage | per acre | 1 Mar 2025 | $6,020 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 3, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "BU", sub-row "TOTAL", column heading "R-1 40%" · source document ↗
| ||||
| Zone 2 | ||||
| Multi-family | column "R-4, T-P" | per gross acre | — | $6,820 |
the line this rate was read from
the levying document · source document ↗
| ||||
| Multi-family | R-3 multifamily | per acre | 1 Mar 2025 | $6,050 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 5, table "DRAINAGE FEE SCHEDULE FOR ZONE 2: PLANNED LOCAL DRAINAGE AREAS", Area row "Zone 2", sub-row "TOTAL", column heading "R-3" · source document ↗
| ||||
| Single-family detached | R-1 50% coverage | per acre | 1 Mar 2025 | $5,550 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 5, table "DRAINAGE FEE SCHEDULE FOR ZONE 2: PLANNED LOCAL DRAINAGE AREAS", Area row "Zone 2", sub-row "TOTAL", column heading "R-1 50%" · source document ↗
| ||||
| Multi-family | column "R-2, M-H" | per gross acre | — | $5,550 |
the line this rate was read from
the levying document · source document ↗
| ||||
| Single-family detached | R-1 45% coverage | per acre | 1 Mar 2025 | $5,360 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 5, table "DRAINAGE FEE SCHEDULE FOR ZONE 2: PLANNED LOCAL DRAINAGE AREAS", Area row "Zone 2", sub-row "TOTAL", column heading "R-1 45%" · source document ↗
| ||||
| Single-family detached | R-1 40% coverage | per acre | 1 Mar 2025 | $5,160 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 5, table "DRAINAGE FEE SCHEDULE FOR ZONE 2: PLANNED LOCAL DRAINAGE AREAS", Area row "Zone 2", sub-row "TOTAL", column heading "R-1 40%" · source document ↗
| ||||
| Area 1G | ||||
| Multi-family | column "R-4, T-P" | per gross acre | — | $6,730 |
the line this rate was read from
the levying document · source document ↗
| ||||
| Multi-family | R-3 multifamily | per acre | 1 Mar 2025 | $5,840 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 4, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "1G", sub-row "TOTAL", column heading "R-3" · source document ↗
| ||||
| Single-family detached | R-1 50% coverage | per acre | 1 Mar 2025 | $5,320 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 4, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "1G", sub-row "TOTAL", column heading "R-1 50%" · source document ↗
| ||||
| Multi-family | column "R-2, M-H" | per gross acre | — | $5,320 |
the line this rate was read from
the levying document · source document ↗
| ||||
| Single-family detached | R-1 45% coverage | per acre | 1 Mar 2025 | $5,120 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 4, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "1G", sub-row "TOTAL", column heading "R-1 45%" · source document ↗
| ||||
| Single-family detached | R-1 40% coverage | per acre | 1 Mar 2025 | $4,910 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 4, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "1G", sub-row "TOTAL", column heading "R-1 40%" · source document ↗
| ||||
| Area BW | ||||
| Multi-family | column "R-4, T-P" | per gross acre | — | $5,560 |
the line this rate was read from
the levying document · source document ↗
| ||||
| Multi-family | R-3 multifamily | per acre | 1 Mar 2025 | $4,860 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 3, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "BW", sub-row "TOTAL", column heading "R-3" · source document ↗
| ||||
| Single-family detached | R-1 50% coverage | per acre | 1 Mar 2025 | $4,430 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 3, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "BW", sub-row "TOTAL", column heading "R-1 50%" · source document ↗
| ||||
| Multi-family | column "R-2, M-H" | per gross acre | — | $4,430 |
the line this rate was read from
the levying document · source document ↗
| ||||
| Single-family detached | R-1 45% coverage | per acre | 1 Mar 2025 | $4,270 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 3, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "BW", sub-row "TOTAL", column heading "R-1 45%" · source document ↗
| ||||
| Single-family detached | R-1 40% coverage | per acre | 1 Mar 2025 | $4,090 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 3, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "CL", sub-row "TOTAL", column heading "R-1 40%" · source document ↗
| ||||
| Area CL | ||||
| Multi-family | column "R-4, T-P" | per gross acre | — | $5,500 |
the line this rate was read from
the levying document · source document ↗
| ||||
| Multi-family | R-3 multifamily | per acre | 1 Mar 2025 | $4,820 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 3, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "CL", sub-row "TOTAL", column heading "R-3" · source document ↗
| ||||
| Single-family detached | R-1 50% coverage | per acre | 1 Mar 2025 | $4,420 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 3, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "CL", sub-row "TOTAL", column heading "R-1 50%" · source document ↗
| ||||
| Multi-family | column "R-2, M-H" | per gross acre | — | $4,420 |
the line this rate was read from
the levying document · source document ↗
| ||||
| Single-family detached | R-1 45% coverage | per acre | 1 Mar 2025 | $4,260 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 3, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "CL", sub-row "TOTAL", column heading "R-1 45%" · source document ↗
| ||||
| Single-family detached | R-1 40% coverage | per acre | 1 Mar 2025 | $4,090 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 3, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "CL", sub-row "TOTAL", column heading "R-1 40%" · source document ↗
| ||||
| Area CZ | ||||
| Multi-family | column "R-4, T-P" | per gross acre | — | $4,590 |
the line this rate was read from
the levying document · source document ↗
| ||||
| Multi-family | R-3 multifamily | per acre | 1 Mar 2025 | $4,100 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 3, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "CZ", sub-row "TOTAL", column heading "R-3" · source document ↗
| ||||
| Single-family detached | R-1 50% coverage | per acre | 1 Mar 2025 | $3,770 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 3, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "CZ", sub-row "TOTAL", column heading "R-1 50%" · source document ↗
| ||||
| Multi-family | column "R-2, M-H" | per gross acre | — | $3,770 |
the line this rate was read from
the levying document · source document ↗
| ||||
| Single-family detached | R-1 45% coverage | per acre | 1 Mar 2025 | $3,640 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 3, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "CZ", sub-row "TOTAL", column heading "R-1 45%" · source document ↗
| ||||
| Single-family detached | R-1 40% coverage | per acre | 1 Mar 2025 | $3,510 |
the line this rate was read from
FMFCD "2025 DRAINAGE FEE SCHEDULE / City of Clovis / Effective Date: 3/1/2025", p. 3, table "DRAINAGE FEE SCHEDULE FOR ZONE 1: PLANNED LOCAL DRAINAGE AREAS", Area row "CZ", sub-row "TOTAL", column heading "R-1 40%" · source document ↗
| ||||