WaterSet by connection chargeCitation CCWD Ordinance 2026-01, dated March 25, 2026

CCWD water capacity charge - West Point

Levied by Calaveras County Water District on new development in Calaveras County (unincorporated). Collected other: before the service is installed — paid with the Utility Service Request, which requires the County building permit.

What one house pays

$15,320

This fee is not in Calaveras County (unincorporated)'s published figure. This site publishes a home outside any plan area, and this charge applies only in West Point. The amount shown is what it costs a house that is there.

Total one-time fees here
$86,316
Adjustment
Adjusts yearly · ENR construction cost index
what the document says

ENR-CCI annual (20-cities average, December to December)

Next expected change
1 Jul 2027

The record

Why it exists

“A capacity charge is a one-time charge that is collected from new customers or developers when they connect to an existing system or increase the demand on the system. Capacity charges help fund infrastructure needed to serve new development. They ensure that existing customers don't subsidize the cost of growth.”

CCWD, "Capacity Fees 2026", under heading "What is a Capacity Charge?", retrieved 2026-09-10 · source document ↗
What it pays for

“The updated capacity fees include both buy-in costs for recovery of the cost of prior construction of existing assets previously built and financed by CCWD and buy-up costs for future water and wastewater facility improvements that are necessary for expansion and to increase capacity to serve new future customers.”

Agenda Item, Damon Wyckoff, Director of Operations, 9 March 2022, "FINANCIAL CONSIDERATIONS", p. 2/2 · source document ↗
Where it applies

“Schedule A, Capacity Charge Table 1 | Service Area | Water | Sewer | 5/8" Meter | Per SFDE | West Point | 15,320 | 5,600”

"Calaveras County Water District Adjustments to Fee Schedules As of July 1, 2026", Schedule A, Capacity Charge Table 1, service-area row · source document ↗
When it was adopted

2006-09-27

“WHEREAS, the Board of Directors of the Calaveras County Water District (District) adopted Ordinance No. 2006-03 on September 27, 2006, and;”

Ordinance No. 2022-__, "AMENDMENT TO ORDINANCE NO. 2006-03 SCHEDULE A REVISING OF WATER AND WASTEWATER CAPACITY CHARGES", 9 March 2022, first recital, p. 1 of 2 · source document ↗
Who adopted it

Ordinance No. 2006-03

“WHEREAS, the Board of Directors of the Calaveras County Water District (District) adopted Ordinance No. 2006-03 on September 27, 2006, and;”

Ordinance No. 2022-__, "AMENDMENT TO ORDINANCE NO. 2006-03 SCHEDULE A REVISING OF WATER AND WASTEWATER CAPACITY CHARGES", 9 March 2022, first recital, p. 1 of 2 · source document ↗
When it is paid

“It is important to keep in mind that all fees are to be paid prior to the installation of services and that the District is to inspect all work.”

"Welcome to the Calaveras County Water District", Welcome page 1 of 1 · source document ↗
Who collects it

Calaveras County Water District, the agency that levies it

“Activation of the service connection is obtained by paying the required fees, submitting applicable information about the lot, and having a Customer Service Representative fill out a Utility Service Request (USR) form. The signed USR form will initiate the installation of the water meter, inspections, and bi-monthly service charges. The current fees are included with this packet.”

"APPLICATION FOR NEW SERVICE", GENERAL INFORMATION, "Properties with a Service Connection", New Service p. 1 of 5 · source document ↗
Who is exempt

“Residential customers who require a 1-inch meter to comply with state-mandated fire sprinkler system flow requirements will be charged the same capacity fees as customers with 5/8-inch meters. Customers requiring meters larger than 1-inch to meet state-mandated fire sprinkler system flow requirements must pay full capacity fees.”

Schedule A, Capacity Charges, exhibit to Ordinance No. 2022-__, 9 March 2022, Table 1 Notes, note 3 · source document ↗

Every published rate

Every rate below applies to single-family detached.

Applies toBasisEffectiveAmount
water, 5/8 inch meter per EDU 1 Jul 2026 $15,320
the line this rate was read from

“Schedule A, Capacity Charge Table 1 — Service Area / Water / Sewer; 5/8\" Meter / Per SFDE — West Point 15,320 5,600”

Calaveras County Water District, "Adjustments to Fee Schedules As of July 1, 2026", Schedule A, Capacity Charge Table 1, West Point row, Water column headed 5/8" Meter · source document ↗

About these figures

Quoted, not summarized. Every amount and fact on this page is copied from the official document it links to. If we couldn’t find something in a document, we leave it blank instead of guessing.

Before any discounts. Some fees offer credits, waivers or phase-ins. They’re listed above but not subtracted, because whether you qualify depends on your project.

Check the date. Fees change. This page shows what was in force on the date at the top, with a link to the document that set it, so you can confirm the current amount yourself. How all of this is put together.